Work algorithm
- Analysis of draft layouts
- Analysis of the premises space, engineering, possibilities for adaptation and extension
- Evaluation of work load, draft cost estimation
- Selection of subcontractors for main works, taking into account Client's preferences
- Getting permission for work from supervisory authorities
- Arrangement of construction site
- Delivery of materials to the site
- Dismantling
- Installation of blasterboard partitions and door frames
- Ceiling installation
- Fit out of walls and ceiling
- Floor pouring or raised floor installation
- Installation of bathroom fitments
- Installation of electricity supply and lighting
- Installation (adaptation) of heating and conditioning systems
- Installation (adaptation) of fire alarm systems and automated gas and water fire fighting
- Installation of structured cabling systems
- Installation of dismoutable partitions
- Laying of ceramic tiles and floor covering
- After construction cleaning
- Elaboration of design documentation and its agreement with supervisory authorities
- Letting the premises to the Client
Contract 20 ęB
Cost estimation 20 ęB
|
News and events
Construction works for Boehringer Ingelheim completed
Construction Solutions signed two contracts for fit-out works in CatCargo and Honda premises.
Office premises of Colliers International taken into use
|