Work algorithm

  1. Analysis of draft layouts
  2. Analysis of the premises space, engineering, possibilities for adaptation and extension
  3. Evaluation of work load, draft cost estimation
  4. Selection of subcontractors for main works, taking into account Client's preferences
  5. Getting permission for work from supervisory authorities
  6. Arrangement of construction site
  7. Delivery of materials to the site
  8. Dismantling
  9. Installation of blasterboard partitions and door frames
  10. Ceiling installation
  11. Fit out of walls and ceiling
  12. Floor pouring or raised floor installation
  13. Installation of bathroom fitments
  14. Installation of electricity supply and lighting
  15. Installation (adaptation) of heating and conditioning systems
  16. Installation (adaptation) of fire alarm systems and automated gas and water fire fighting
  17. Installation of structured cabling systems
  18. Installation of dismoutable partitions
  19. Laying of ceramic tiles and floor covering
  20. After construction cleaning
  21. Elaboration of design documentation and its agreement with supervisory authorities
  22. Letting the premises to the Client


ico16_doc.gif Contract 20 ęB

ico16_doc.gif Cost estimation 20 ęB

 

News and events

Construction works for Boehringer Ingelheim completed
more »
Construction Solutions signed two contracts for fit-out works in CatCargo and Honda premises.
more »
Office premises of Colliers International taken into use
more »
© Copyright 2008-2010. All rightsv reserved. Development by Freesia 2008.